Back

IVU.rail at AKN

Kaltenkirchen, Germany

Overview

Employees130 train drivers
Vehicles33 traction units
Transport Services12 million passengers per year
OperationsRegional passenger rail transport
ObjectivesIntegration of duty scheduling and run scheduling, Improvement of planning results, Digitalisation of personnel dispatch
Specific DetailsSwift and simple provision as part of a system upgrade, Integrated workflow from planning and dispatch to the settlement
IVU productsIVU.timetable, IVU.run, IVU.duty, IVU.crew, IVU.pad.employee, IVU.control

 

Initial situation

AKN Eisenbahn GmbH is a firmly established part of the Schleswig-Holstein rail sector. For more than 130 years, it has guaranteed regular rail transport from the centre and the south of Schleswig-Holstein to and from the Hamburg metropolitan area. Today, the company operates three routes with 33 traction units and 130 train drivers: between Neumünster and Hamburg-Eidelstedt, Elmshorn and Ulzburg Süd as well as Nor­der­stedt Mitte and Ulzburg Süd. Due to growing demands for efficiency and planning quality, the planners were facing challenges that they could not meet to the extent hoped for with the existing system, in which duties and vehicle runs were created in separate processes.

Objectives

In order to improve the planning results and particularly to unburden the planners and dispatchers, AKN decided to replace the existing system by introducing an integrated system. As well as a uniform approach to personnel dispatch and the combined planning of duties and vehicle runs, it was also intended that optimisation functions should contribute to more efficient personnel deployment. In addition, AKN hoped to automate numerous workflows and thereby noticeably reduce time and effort for planners and dispatchers.


"By introducing personnel dispatch, we’re forging further ahead with digitalisation in our company. Small-scale processes such as duty swaps and reporting in sick can now be done 100% electronically without any intermediate steps or pieces of paper.”
Ulrich Bergmann
Managing Director

Outcome

The introduction of IVU.rail has significantly simplified the work of the planners and dispatchers at AKN. All relevant data from the duty scheduling and run scheduling as well as the personnel dispatch is now available at any time, meaning that the work cycles are now significantly quicker. Thanks to the optimisation and automation functions, AKN now has better balanced and more efficient duty schedules and run schedules, with less time and effort needed for their creation.

Save as PDF

Last update: July 2018

More references
Case study Abellio train on the track at sunset with golden light and green landscape

Case Studies

IVU.rail at Abellio

Saale-Thüringen-Südharz, Germany

Learn more

Learn more
Case study Two red commuter trains at modern station illustrating network and timetable planning

Case Studies

IVU.rail at DB Regio

Frankfurt am Main, Germany

Learn more

Learn more
Case study SBB Cargo train crossing a viaduct in the Alps

Case Studies

IVU.rail at SBB Cargo

Olten, Switzerland

Learn more

Learn more
Feel free to contact us
We look forward to hearing from you

Do you want to talk with a customer advisor or learn more about career opportunities with us? Or maybe there is something else you want to talk to us about? Write to us – your contact person will get back in touch with you as quickly as possible.

Get in touch

IVU Traffic Technologies AG
Headquarters
Bundesallee 88
12161 Berlin, Germany

Phone: +49.30.8 59 06 -0
E-mail: contact@ivu.com

Subscribe to IVU News

Stay up to date – receive news about our projects, customers, and products directly in your inbox.